Curb and Rebuild

For this method we use the existing fence posts as a framework to pour a 6-inch high curb around the perimeter of the court. Inside the curb we install a minimum of 4 inches of compacted stone and a minimum of 2 inches compacted asphalt. This rebuild is used for courts with extensive cracking but no severe base of drainage problems.